Owner's Manual. The closeout binder that builds itself.
Assets by CSI division, each pulling in its submittals, warranties, punch items, RFIs, photos and documents — handed over as a PDF or a login-free link.

Step 1 of 8
Organised by CSI division
Every asset in the building, filed under its division — doors, finishes, plumbing, HVAC, electrical.
Click the highlighted area, press →, or hit Next. 8 steps, about a minute.
More walkthroughs
The rest of the job.

Activity Feed
Everything that changed, in one inbox.

Daily Reports
The day, signed and locked.

Punch List
Items by location, with photos, from Work required to Closed.

RFIs
Ask, route, answer — on the record.

Submittals
Ball in court, never in doubt.

Plans & Specs
A planroom in the browser.

Tasks
Assignable, with subtasks and dependencies.

Schedule
A three-week look-ahead beside the work.

Observations
Point it out. Then own it, or escalate it.

Checklists
Field QC from reusable templates.

