How to write a daily construction report in ten minutes

What to include in a daily construction report so it holds up later and the owner actually reads it, plus how to write it in ten minutes.

In this post
  1. What goes in a daily report
  2. Write it so it holds up later
  3. Write it so the owner reads it
  4. Getting it down to ten minutes

A daily report has two readers: the owner skimming it this week, and the lawyer reading it two years from now. Write for both and it'll be short, factual and useful. Here's what to include in a daily construction report, and how to keep it to ten minutes at the end of the day.

The short version

  • Cover weather, manpower by company, work done, deliveries, visitors, delays and safety.
  • Put a two-line summary at the top for the owner.
  • Write it the same day, stick to facts, and sign it.

What goes in a daily report

  • Date, weather and site conditions. Temperature, rain, wind, and how they affected the work ("No concrete placed; 1.2 in. rain overnight, subgrade saturated").
  • Manpower. Each company on site and its headcount. This is the line most often asked for later.
  • Work performed. By area and trade, in plain sentences: "Framing crew set second-floor trusses, grids A to D."
  • Deliveries and equipment. What arrived, what was rejected, what equipment was on site.
  • Visitors and inspections. Who came, and the result of each inspection.
  • Delays and issues. What stopped work, who caused it and what you did about it. Record facts, not blame.
  • Safety. Toolbox talks, incidents, near misses.
  • Photos. A handful that show progress and anything noted in the report.

Write it so it holds up later

Write it the same day. Stick to what you saw, not what you think happened. Name companies, not just trades. If a sub was told something, write who told them and when. Then sign it, so it's a record and not a draft.

Write it so the owner reads it

Put a two-line summary at the top: what moved today and anything they need to know. Owners skim. If the only important line is buried in paragraph six, they'll miss it and ask you on the phone.

Getting it down to ten minutes

  • Start from yesterday's report. Manpower and equipment rarely change much.
  • Take photos during the day, not at 5 p.m.
  • Dictate the work-performed section on the drive out, then tidy it up.

Daily report checklist

  • Date, weather and site conditions
  • Each company on site and its headcount
  • Work performed by area and trade
  • Deliveries and equipment
  • Visitors and inspection results
  • Delays: what, who caused it, what you did
  • Safety talks, incidents, near misses
  • A few photos
  • Two-line summary at the top
  • Sign it the same day